Pumping Concrete on the Burj Dubai

Product Related Information

  • Burj Khalifa, Dubai (Burj Dubai or Tower of Kahlifa) | …

    Burj Dubai break the world record for altitude transportation of concrete The total area of cladding used to cover the Burj Dubai is equivalent to 17 football fields. The concrete used for the Burj Dubai is equivalent to: a solid cube of concrete 61 metres on a side, a sidewalk 1,900 kilometres long, the weight of 100,000 elephants.

    GET A QUOTE
  • Concrete Pumps Reach Record-Breaking Heights at Burj …

    New heights reached in concrete pumping - World Pumps

    GET A QUOTE
  • BURJ KHALIFA - Study Mafia

    13 May 2007: Sets record for vertical concrete pumping on any building at 452 m (1,483 ft), surpassing the 449.2 m (1,474 ft) to which concrete was pumped during the construction of Taipei 101, while Burj Khalifa reached 130 floor. 21 July 2007: Surpasses

    GET A QUOTE
  • Structural Details of Burj Khalifa - Concrete Grade and …

    12/5/2010 · Putzmeister's specially designed BSA 14000 SHP-D reached a world record vertical concrete pumping height of 1,988 feet (606m) topping out Burj Khalifa, (previously known as Burj Dubai) …

    GET A QUOTE
  • Burj Dubai - Data, Photos & Plans - WikiArquitectura

    3/3/2010 · Back in November 2007 a new world record height of 601 m for pumping concrete was set by a Putzmeister 14000 SHP D super high pressure concrete pump being operated by Unimix on the Burj Dubai Tower in Dubai.

    GET A QUOTE
  • BURJ KHALIFA - Study Mafia

    13 May 2007: Sets record for vertical concrete pumping on any building at 452 m (1,483 ft), surpassing the 449.2 m (1,474 ft) to which concrete was pumped during the construction of Taipei 101, while Burj Khalifa reached 130 floor. 21 July 2007: Surpasses

    GET A QUOTE
  • Burj Khalifa — Conquering the World's Tallest Building | …

    13/5/2010 · Putzmeister's specially designed BSA 14000 SHP-D reached a world record vertical concrete pumping height of 1,988 feet (606m) topping out Burj Khalifa, (previously known as Burj Dubai) the world's tallest building at 2,717 feet (828m) high, in the United Arab Emirates. "This extreme pump height was possible due to the trust and

    GET A QUOTE
  • (PPT) Burj | Jaineet Mandot - Academia.edu

    and pumping • The wing wall construction is • Advanced concrete pumping followed by the wing flat plat slab technology construction, and….. • Formwork system that can be • the nose columns are followed by dismantled and assembled quickly flat plate and flat slab construction with …

    GET A QUOTE
  • How was Dubai's 828m-tall Burj Khalifa built? - …

    4/1/2018 · 606 Metres is the height to which concrete was pumped, a world record for concrete pumping. 504 Metres is how high the Burj Khalifa's main service lift travels, the most of any elevator. 57 Elevators will move occupants around. 31,400 Tonnes of rebar were used

    GET A QUOTE
  • New heights reached in concrete pumping - ScienceDirect

    Concrete Pumps Reach Record-Breaking Heights at Burj Khalifa | Pump…

    GET A QUOTE
  • Unimix sets record for concrete pumping | Property – …

    25/5/2007 · Dubai: Readymix concrete maker Unimix has made history by setting a world record for the highest single-stage pumping of concrete on May 13, the company said in an e …

    GET A QUOTE
  • Burj Khalifa- Dubai's 1st large & Mixed Use Development

    20/5/2020 · Burj Khalifa, also known as Dubai tower is the tallest building of the world situated in Dubai with the height of 828 m (2717 ft). It is used of many purposes like residential, hotel, office, club and more. Therefor, it is known as Dubai's 1st large scale and mixed use development. So, let's find out more information about this amazing

    GET A QUOTE
  • New heights reached in concrete pumping

    in concrete pumping In April 2008, a new world record height of 606 m for pumping concrete was set on the Burj Dubai Tower in Dubai. Bryan Orchard looks at the high pressure peristaltic or piston pump technology behind this level of performance and the B

    GET A QUOTE
  • Burj Khalifa – a new high for high-performance concrete | …

    Concrete pumping trials were conducted before the Burj Khalifa tower construction using a Putzmeister BSA 14000 HP-D stationary pump with a maximum hydraulic pressure of 310 bar. A length of 600 m of high-pressure ZX 125 delivery pipe was laid out horizontally with transducers to measure concrete pressure after pumping through distances of 250, 450 and 600 m ( Figure 3 ).

    GET A QUOTE
  • High-rise pumping at the Burj Dubai at over 400 bar delivery …

    New heights reached in concrete pumping - World Pumps

    GET A QUOTE
  • Burj Dubai Skyscraper Building - e-architect

    21/7/2007 · Burj Dubai has already set a new world record for vertical concrete pumping for a building by pumping to over 460 metres (1,509 ft). The previous record of …

    GET A QUOTE
  • Burj Khalifa - Wikipedia

    4/9/2007 · Standing 160 stories above ground, the final height of the Burj Dubai is still unknown. Structurally reinforced concrete and self-consolidating concrete will give this super-tall building the strength it needs to withstand wind forces and the site's corrosive soil.

    GET A QUOTE
  • (PDF) Concrete for high-rise buildings: Performance …

    An international case study on the Burj Khalifa (Dubai), the world's tallest building, was conducted. Findings from the case studies relating to compressive strength, pumping, pumpability

    GET A QUOTE
  • Burj Dubai Concrete Pumping - YouTube

    Developing efficient concrete pumping for the spectacular delivery height at the Burj Dubai was just one of the many tasks for Putzmeister engineers. A partic-ular challenge was the delivery line system, its wear behaviour and its com-pressive strength as well as

    GET A QUOTE
  • New heights reached in concrete pumping - World Pumps

    Structural Details of Burj Khalifa - Concrete Grade and

    GET A QUOTE